• Title of article

    Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times

  • Author/Authors

    Lars M?nch، نويسنده , , Hari Balasubramanian، نويسنده , , John W. Fowler، نويسنده , , Michele E. Pfund، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2005
  • Pages
    20
  • From page
    2731
  • To page
    2750
  • Abstract
    This research is motivated by a scheduling problem found in the diffusion and oxidation areas of semiconductor wafer fabrication, where the machines can be modeled as parallel batch processors. We attempt to minimize total weighted tardiness on parallel batch machines with incompatible job families and unequal ready times of the jobs. Given that the problem is NP-hard, we propose two different decomposition approaches. The first approach forms fixed batches, then assigns these batches to the machines using a genetic algorithm (GA), and finally sequences the batches on individual machines. The second approach first assigns jobs to machines using a GA, then forms batches on each machine for the jobs assigned to it, and finally sequences these batches. Dispatching and scheduling rules are used for the batching phase and the sequencing phase of the two approaches. In addition, as part of the second decomposition approach, we develop variations of a time window heuristic based on a decision theory approach for forming and sequencing the batches on a single machine.
  • Keywords
    Pilot workload , Feature exploitation , Feature identification and classification , Feature combination , Feature calibration , Mental Workload , Feature space , Feature saliency , Artificial neural network , Backpropagation , Signal-to-noise ratio (SNR)
  • Journal title
    Computers and Operations Research
  • Serial Year
    2005
  • Journal title
    Computers and Operations Research
  • Record number

    928304