Title of article
Minimizing makespan on an m-machine re-entrant flowshop
Author/Authors
Seong-Woo Choi، نويسنده , , Yeong-Dae Kim، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2008
Pages
13
From page
1684
To page
1696
Abstract
This paper focuses on an m-machine re-entrant flowshop scheduling problem with the objective of minimizing makespan. In the re-entrant flowshop considered here, routes of all jobs are identical as in ordinary flowshops, but the jobs must be processed multiple times on the machines. We present heuristic algorithms, which are modified from well-known existing algorithms for the general m-machine flowshop problem or newly developed in this research. For evaluation of the performance of the algorithms, computational experiments are performed on randomly generated test problems and results are reported.
Keywords
Flowshop , Scheduling , Re-entrant , Heuristics
Journal title
Computers and Operations Research
Serial Year
2008
Journal title
Computers and Operations Research
Record number
928680
Link To Document