Title of article
A heuristic approach for tow-machine no-wait flowshop scheduling with due dates and class setups
Author/Authors
Xiuli Wang، نويسنده , , T.C.E. Cheng، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2006
Pages
19
From page
1326
To page
1344
Abstract
This paper studies the two-machine flowshop scheduling problem with class setups in a no-wait processing environment to minimize the maximum lateness. The jobs are divided into job classes and a setup is required at the initial processing of a job or between the processing of jobs of different classes. In a no-wait environment, a job must be processed from start to finish without interruptions on a machine or between the machines. A batch is a maximal subset of consecutively processed jobs of the same class. Several properties concerning the beneficial merging of batches and some dominance rules that improve the objective function are derived. Since the problem is NP-hard, a heuristic is proposed and evaluated computationally. The numerical results demonstrate that the heuristic can produce near-optimal solutions quickly for realistic-sized problems.
Keywords
Performance evaluation , Mean value analysis , Machine Failure , Yield , Re-entrant manufacturing system
Journal title
Computers and Operations Research
Serial Year
2006
Journal title
Computers and Operations Research
Record number
928709
Link To Document