Title of article
Two Stage Flow Shop Scheduling Problem Including Transportation Time and Weightage of Jobs with Branch and Bound Method
Author/Authors
Gupta، D. نويسنده , , Bala، Sh نويسنده , , Singla، P نويسنده ,
Issue Information
فصلنامه با شماره پیاپی 10 سال 2013
Pages
6
From page
1
To page
6
Abstract
Abstract This paper presents an algorithm with the help of branch and bound approach for the two stage flow shop scheduling problem including transportation time and weightage of jobs; processing times are associated with their respective probabilities. Our main objective is to find the optimal/ near optimal sequence of jobs in order to minimize the total elapsed time. An algorithm is clarified with the help of a numerical example.
Journal title
International Journal of Applied Operational Research
Serial Year
2013
Journal title
International Journal of Applied Operational Research
Record number
945883
Link To Document