• Title of article

    Small–medium sized nuclear coal and gas power plant: A probabilistic analysis of their financial performances and influence of CO2 cost

  • Author/Authors

    Giorgio Locatelli، نويسنده , , Mauro Mancini، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2010
  • Pages
    15
  • From page
    6360
  • To page
    6374
  • Abstract
    Nations or regions with limited electrical grid and restricted financial resources are a suitable market for small medium power plants with a size of 300–400 MWe. The literature presents several comparisons about the economics of large power plants (of about 1000 MWe); however there are not probabilistic analysis regarding the economics of small medium power plants. This paper fills this gap comparing, with a Monte Carlo evaluation, the economical and financial performances of a nuclear reactor, a coal fired power plant and a combined cycle gas turbine (CCGT) of 335 MWe. The paper aims also to investigate the effect of the carbon tax and electrical energy price on the economics of these plants. The analysis show as, without any carbon tax, the coal plant has the lowest levelised unit electricity cost (LUEC) and the highest net present value (NPV). Introducing the carbon tax the rank changes: depending on its amount the first and the nuclear after becomes the plant with lower LUEC and highest NPV. Therefore, the uncertainty in the carbon tax cost increases the risk of investing in a coal plant above the level of the new small medium reactor.
  • Keywords
    LUEC , Small medium plant , Monte Carlo
  • Journal title
    Energy Policy
  • Serial Year
    2010
  • Journal title
    Energy Policy
  • Record number

    970103