• Title of article

    Enhancing power supply adequacy in Spain: Migrating from capacity payments to reliability options

  • Author/Authors

    Carlos Batlle، نويسنده , , Carlos Vazquez، نويسنده , , Michel Rivier، نويسنده , , Ignacio J. Perez-Arriaga، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2007
  • Pages
    10
  • From page
    4545
  • To page
    4554
  • Abstract
    There has been total unanimity about the vital importance of reliability of supply since the beginning of the electricity sector deregulation process. This paper describes the procedure proposed by Pérez-Arriaga et al. [2005. White paper for the reform of the regulatory scheme of the power generation in Spain. For the Ministry of Industry, Tourism and Trade of Spain (in Spanish)] to improve upon the current scheme to guarantee a reasonable reserve margin, the capacity payment mechanism. This alternative design introduces improvements aimed at guaranteeing at least a minimum capacity reserve margin, as well as at providing a strong incentive for generating units to be available when needed, namely, in situations when supply is likely to be insufficient to meet the total demand.
  • Keywords
    Electricity restructuring , Electricity markets regulation , Security of supply
  • Journal title
    Energy Policy
  • Serial Year
    2007
  • Journal title
    Energy Policy
  • Record number

    971774