• Title of article

    The limits of HVDC transmission

  • Author/Authors

    William F. Pickard، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2013
  • Pages
    9
  • From page
    292
  • To page
    300
  • Abstract
    Renewable energy is abundant, but not necessarily near the urban centers where it will be used. Therefore, it must be transported; and this transport entails a systemic energy penalty. In this paper simple qualitative calculations are introduced to show (i) that high-voltage direct-current (HVDC) power lines for megameter and greater distances are unlikely to achieve power capacities much beyond 2 GW, although they can be paralleled; (ii) that most sources and sinks of electric power are rather less than 10,000 km apart; (iii) that such long lines can be constructed to have transmission lossesView the MathML source2%; and (iv) that lines of such low loss in fact meet minimal standards of intergenerational equity.
  • Keywords
    Renewable energy , Corona loss , Ohmic loss
  • Journal title
    Energy Policy
  • Serial Year
    2013
  • Journal title
    Energy Policy
  • Record number

    974513