چكيده لاتين :
The use of Value Engineering (VE) methodology in construction industry has grown
significantly, mainly in view of its extensive benefits. The main task in evaluation phase of VE
workshop is to assess alternative ideas, proposedfor each function. This phase ofVE, hence, could
be deemed as a Multi Criteria Decision Making (MCDM) problem. This paper presents a fuzzy
Decision Support System (DSS) to be employed in evaluation phase of VEe The proposed multi
alternative decision model may be recommended where alternativesי preferences ratios are
different, and scores assigned to each alternative idea are uncertain. As use of VE has greater
payoffs at the earlier stages ofthe construction projects, in which most ofthe criteria are still vague
and not precisely defined, exploiting this DSS may result in more tangible model ofdecision making
process and satisfactory outlook of VE studies in construction projects. A ranking methodology in
a spreadsheet template is also provided to facilitate the ranking process. Performance of the
proposed methodology is tested using a case example in the tunneling industry.