چكيده لاتين :
This investigation studies two-machine flow-shop scheduling problems in which both machines are versatile and setup time is considered. First, a modified branch and bound algorithm for determining the optimal
schedule is developed to minimize the makespan of jobs for these problems. Second, a genetic algorithm is used to rapidly find near-optimal schedules for large scale problems. Finally, computational experiments are performed to illustrate the effectiveness and efficiency of the proposed algorithms