شماره ركورد كنفرانس :
3926
عنوان مقاله :
Combined Heat and Power Sizing in Residential Building Using Mixed Integer Nonlinear Programming Optimization Method
پديدآورندگان :
Malekshah Soheil soheil.malekshah@gmail.com Department of Power Engineering, Faculty of Electrical Engineering, South Tehran Branch, Islamic Azad University, Tehran, Iran , Hovanessian Arin arin_hovanessian@yahoo.com Young Researchers and Elite Club, South Tehran Branch, Islamic Azad University, Tehran, Iran , Gharehpetian .Gevork B grptian@aut.ac.ir Department of Electrical Engineering, Amirkabir University of Technology, Tehran, 15875-4413, Iran
تعداد صفحه :
6
كليدواژه :
Auxiliary boiler , CHP unit , MINLP optimization method , Natural gas , Residential building
سال انتشار :
1395
عنوان كنفرانس :
بيست و چهارمين كنفرانس مهندسي برق ايران
زبان مدرك :
انگليسي
چكيده فارسي :
Combined heat and power (CHP), or cogeneration, is one of the power and heat generation systems that applied in a wide range of residential applications. The CHP unit most applications are in the residential building that the both electricity generation and the heating consumption supplying is applied. In CHP, the heat losses of the gas turbine are used for the building heating purposes. In this paper, the optimal size of the CHP unit based on the electrical power grid purchasing cost, CHP unit and boiler operation cost, CHP unit and auxiliary boiler annual investment cost, emission cost and the power load consumer benefit cost due to power marketing to the power grid are defined as the most important parameters of the objective function that are minimized using Mixed Integer Nonlinear Programming (MINLP) optimization method. The approaches of the paper are organized into two different scenarios of CHP unit presence in the residential building. In the case of the CHP unit connection to the residential building, the electrical and thermal loads are supplied, completely. But, in the case of the CHP unit disconnected from the residential building, the thermal and electrical loads are supplied by the auxiliary boiler and power grid, respectively.
كشور :
ايران
لينک به اين مدرک :
بازگشت