شماره ركورد كنفرانس :
4046
عنوان مقاله :
روشي نوين در مقابله با خطرات گير لوله ها در ميادين گازي، مطالعه موردي
عنوان به زبان ديگر :
A Novel Method to Prevent Stuck-pipe Incidents in Iranian Gas Fields; A Case Study
پديدآورندگان :
اورنگي مجتبي mojtaba.owrangi@gmail.com شركت حفاري شمال;
تعداد صفحه :
7
كليدواژه :
گير لوله , هرزروي , پايداري چاه , تميز سازي ته چاه
سال انتشار :
1396
عنوان كنفرانس :
چهارمين كنفرانس بين المللي نوآوري هاي اخير در شيمي و مهندسي شيمي
زبان مدرك :
انگليسي
چكيده فارسي :
The drilling industry is currently investigating different ways of decreasing costs through multitude of enterprising. The stuck pipe is classified as one of the main difficulties because it happens regularly and leads to substantial loss of drilling time. It usually happens in high pressure wells and leads to enormous delays and costs in Iran, every year. Even if distinctive techniques and procedures have been developed to reduce the probability of happening of this phenomenon and these have saved drilling industry millions of dollars, they suffer from exclusive prognostication of this event. Many attempts have been made to determine the reasons of stuck pipe and to outline operating practices that will minimize the incident of the problems. In this paper, according to the potential drilling challenges in each drilling section, we presented the planed drilling fluid and the most efficient decisions to prevent stuck pipe in 23”, 16”, 12 ¼” and 8 ½” holes during the drilling of a well in the this field. Also the best lost circulation and stuck pipe strategies for each drilling section are expressed.
چكيده لاتين :
The drilling industry is currently investigating different ways of decreasing costs through multitude of enterprising. The stuck pipe is classified as one of the main difficulties because it happens regularly and leads to substantial loss of drilling time. It usually happens in high pressure wells and leads to enormous delays and costs in Iran, every year. Even if distinctive techniques and procedures have been developed to reduce the probability of happening of this phenomenon and these have saved drilling industry millions of dollars, they suffer from exclusive prognostication of this event. Many attempts have been made to determine the reasons of stuck pipe and to outline operating practices that will minimize the incident of the problems. In this paper, according to the potential drilling challenges in each drilling section, we presented the planed drilling fluid and the most efficient decisions to prevent stuck pipe in 23”, 16”, 12 ¼” and 8 ½” holes during the drilling of a well in the this field. Also the best lost circulation and stuck pipe strategies for each drilling section are expressed.
كشور :
ايران
لينک به اين مدرک :
بازگشت