• شماره ركورد كنفرانس
    4214
  • عنوان مقاله

    Minimizing total weighted late work and cost of resources’ usage in the resource-constrained project scheduling problem

  • پديدآورندگان

    Tavakoli-Moghadam R. University of Tehran, Tehran , Tahaei Z. University of Tehran, Tehran , Talebi E, , University of Tehran, Tehran

  • تعداد صفحه
    5
  • كليدواژه
    Resource , constrained project scheduling , Late work
  • سال انتشار
    1396
  • عنوان كنفرانس
    دهمين كنفرانس بين المللي تحقيق در عمليات
  • زبان مدرك
    انگليسي
  • چكيده فارسي
    One of the problems related to resource-constrained project scheduling problem is weighted late work criterion because maybe activities do not have the same importance. In this paper this problem is considered and the objective is to minimize both the total weighted late work and resources cost. linear integer programming has been proposed for this problem. To prove these possible differences between activities an example is calculated by GAMS and the result is shown.
  • كشور
    ايران