عنوان مقاله
Lessons learned from Production Logging Interpretation of a well in a Gas Condensate Reservoir
Author/Authors
Hamid Reza Nasriani Iranian Central Oil Fields Co. (ICOFC)- National Iranian Oil Co. (NIOC). Reservoir Engineering Department, Zand tower, Shiraz , Mohammad Ghasem Akbarifard Iranian Central Oil Fields Co. (ICOFC)- National Iranian Oil Co. (NIOC). Reservoir Engineering Department, Zand tower, Shiraz , Hossein Vahdani Iranian Central Oil Fields Co. (ICOFC)- National Iranian Oil Co. (NIOC). Reservoir Engineering Department, Zand tower, Shiraz , Mohammad Sinaei Iranian Central Oil Fields Co. (ICOFC)- National Iranian Oil Co. (NIOC). Reservoir Engineering Department, Zand tower, Shiraz , Mahmood Mirbagheri Iranian Central Oil Fields Co. (ICOFC)- National Iranian Oil Co. (NIOC). Reservoir Engineering Department, Zand tower, Shiraz
كليدواژه
PLT , LGR measurements , water production , water entry points , Gas Condensate
سال انتشار
2011
عنوان كنفرانس
The 7th International Chemical Engineering Congress & Exhibition (IChEC 2011
زبان مدرك
انگليسي
چكيده لاتين
This paper compares Production Logging Tool (PLT) interpretations with LGR Test
Measurements and other observations in the field in order to obtain the water production rate and
water entry points in a well of a Gas Condensate Reservoir to validate the PLT tool and explain
existing production problems and to subsequently optimize reservoir management for a gas field in
South of Iran. In this field associated saline water production is an important issue in production
resulting in a substantial productivity impairment of gas wells. In this field 33 wells have been
producing 1450 MMScf/day gas to meet field deliverability requirement. Out of these 33 wells, 12
wells deal with saline water production associated with gas which gas production rate is limited to
saline water production.
Although the tool was run in two stages to detect the water entry points but the tool did not detect
the water entry points and no water production from intervals was observed.
Although the water production rate was 250 STB/Day using test separator but the tool detects no
water production and water entry production intervals showing the poor performance of the tool in
the well.
In order to validate the tool performance it is highly recommended to measure gas, condensate and
water production rate using test separator.
كشور
ايران
تعداد صفحه 2
8
از صفحه
1
تا صفحه
8