شماره ركورد كنفرانس :
4608
عنوان مقاله :
A fuzzy risk-assessment model for maintenance of medical devices based upon OWA operator
عنوان به زبان ديگر :
A fuzzy risk-assessment model for maintenance of medical devices based upon OWA operator
پديدآورندگان :
پرند فرشته آزادي دانشگاه علامه طباطبايي , توكلي گلپايگاني علي پژوهشگاه استاندارد , لاجوردي پوريا دانشگاه علامه طباطبايي
كليدواژه :
Medical device , Maintenance Program , Risk Priority Number , OWA (Ordered Weighted Averaging) operator
عنوان كنفرانس :
چهارمين دوره كنفرانس مهندسي قابليت اطمينان
چكيده فارسي :
Medical equipment maintenance program for its association with the health care issue is of particular importance. Disregarding the maintenance program even in the general medical equipment such as sphygmomanometer can lead to incorrect diagnosis and prescription of treatment, and even fatal results. Unfortunately, the maintenance program based upon periodic inspection or a preset schedule, is insensitive to the type of equipment, operating environment, risk, etc. Which can lead to failure to achieve the expected result. On the other hand due to constraints in financing capacity, physical infrastructure and human resource capability, Prioritize of medical equipment maintenance program based upon the risk has high importance for health centers. In this paper we have introduced the application of Ordered Weighted Average operator for aggregation of different parameters for calculating of Risk priority number (RPN).
چكيده لاتين :
Medical equipment maintenance program for its association with the health care issue is of particular importance. Disregarding the maintenance program even in the general medical equipment such as sphygmomanometer can lead to incorrect diagnosis and prescription of treatment, and even fatal results. Unfortunately, the maintenance program based upon periodic inspection or a preset schedule, is insensitive to the type of equipment, operating environment, risk, etc. Which can lead to failure to achieve the expected result. On the other hand due to constraints in financing capacity, physical infrastructure and human resource capability, Prioritize of medical equipment maintenance program based upon the risk has high importance for health centers. In this paper we have introduced the application of Ordered Weighted Average operator for aggregation of different parameters for calculating of Risk priority number (RPN).