Chotiari Reservoir is a component of the Left Bank Outfall Drain Project in Sindh, Pakistan, located
between the Lower Nara Canal and the Thar Desert, at a distance of approximately 16 kilometers (10
miles) North East of Sanghar. It is one of the most difficult sites from design as well as construction
resources points of view. The reservoir is not very deep but its spread is very wide. It is the longest
earth embankment for reservoir storage in Asia; the reservoir is formed by construction of about 56
kilometers (i.e. 35 miles) of earth embankment, generally of a low height ranging near 5 m (17.5 ft)
with a maximum height of 15.24 m (50 ft). Though the embankment height is not much, adverse
foundation conditions, scarcity of construction material and restrictions imposed by environmental
requirements made it a challenging job.
Due to its long length, the foundation conditions were highly variable. The northern rim of the
reservoir was formed by sand dunes of the Thar Desert. Towards the south-eastern dykes, the
foundations and abutments were in fact on sand dunes. Being in the vicinity of sand dunes, the
foundation soils were generally sandy and relatively pervious towards deeper horizons. This made the
design of a water tight foundation difficult. The construction of a deep cutoff was not possible due to
most of the area being in a waterlogged condition. High seepages were expected through the reservoir
rim and embankment foundation. A portion of the embankment and reservoir was situated over the
Nara Canal. The sediments coming through the Nara Canal were sandy in nature. Therefore, future
sealing of the reservoir bowl by the incoming sediments was a slow process. Moreover, in a major
length the foundation materials were easily erodible and prone to piping. The problems were
emphasized further with the necessity of slope protection requirements along large fetches. Suitable
material for the fill and slope protection were at extensive haulage distances.
A partial cutoff in the form of a key trench, with its width and depth varying along the
embankment length, provided a considerable reduction of the underseepage by lengthening the
seepage path. At other places, upstream and downstream weighted berms were added in, improving
the creep length and subsequently the embankment stability. The overall embankment slopes were
also varied to ensure safe design slopes throughout the embankment length. The slope protection
systems were optimized to reduce both the costs and the extensive haulage operations. The piping
problems were virtually eliminated by covering all seepage discharge areas with well designed
seepage control methods, such as horizontal drainage blanket, chimney and toe drains. These were
provided in various reaches of the embankment, depending on the height of the embankment, the type
of foundation materials and the conditions at the downstream toe. Underwater construction and
puddle core backfills in trench excavations resolved construction difficulties in waterlogged areas.