شماره ركورد كنفرانس
4891
عنوان مقاله
Management of Tunnel Construction Projects with TBM: A System Dynamics Approach
Author/Authors
farshchian mohammad mahdi School of Civil Engineering - College of Engineering - University of Tehran , heravi gholamreza School of Civil Engineering - College of Engineering - University of Tehran
كليدواژه
system dynamics , tunneling , material transportation , TBM
سال انتشار
1391
عنوان كنفرانس
نهمين كنگره بين المللي مهندسي عمران
زبان مدرك
انگليسي
چكيده فارسي
فاقد چكيده فارسي
چكيده لاتين
In tunneling projects using tunnel boring machines (TBM), there is a great risk of cost overruns and schedule delays, so proper management and planning of these projects can save both budget and time. The longitudinal nature of tunneling projects makes them a dynamic system, so that, the more the machine goes ahead, the longer the distance of material being transported. Consequently trains traveling time will be increased and if the transportation system is not empowered appropriately, the TBM will become idle and the project will be delayed. To address this issue, this article introduces a dynamic simulation model using system dynamics that represents processes involved in a TBM tunneling project. The project processes are analyzed, focusing on efficient and timely material transportation. Based on the model results, resources will be allocated properly and as a consequence project performance will be improved. Finally with an example the developed model is examined.
كشور
ايران
تعداد صفحه 2
8
از صفحه
1
تا صفحه
8
لينک به اين مدرک