شماره ركورد كنفرانس :
4891
عنوان مقاله :
Construction Industry Experience of Industralised Building System in Malaysia
Author/Authors :
Syazli Fathi Mohamad Department of Civil Engineering - UTM Razak School of Engineering and Advanced Technology - UTM International Campus, Kuala Lumpur, Malaysia , Abedi Mohammad Department of Civil Engineering - UTM Razak School of Engineering and Advanced Technology - UTM International Campus, Kuala Lumpur, Malaysia , Mirasa Abdul Karim Department of Civil Engineering - UTM Razak School of Engineering and Advanced Technology - UTM International Campus, Kuala Lumpur, Malaysia
كليدواژه :
Malaysia , IBS Roadmap , Effective Construction System , Industrialised Building System , Precast Concrete Framing
عنوان كنفرانس :
نهمين كنگره بين المللي مهندسي عمران
چكيده فارسي :
فاقد چكيده فارسي
چكيده لاتين :
Government of Malaysia has done various efforts to promote the usage of Industrialised Building System (IBS) as an efficient and effective construction system compare to conventional building system. This paper reviews the experiences of Malaysian construction industry in the adoption of IBS from the first level of establishment until its development. This research select IBS as a construction technique in which components are manufactured in a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works. IBS have been categorised to: precast concrete framing, steel formwork system, steel framing systems, block work system and prefabricated timber framing system. A comprehensive review from various sources conducted to define and classified IBS in this paper. The findings of this research illustrated the timeline of IBS establishment and development in Malaysia.