شماره ركورد كنفرانس
5115
عنوان مقاله
Flow Assurance in Pipeline-Riser System Using OLGA Software
پديدآورندگان
Torfi Salehi Mohamad MohammadTorfiSa@yahoo.com Petroleum University of Technology,Ahwaz,Iran , Bahri Moghaddam Mehdi Bahri@aut.ac.ir Petroleum University of Technology,Ahwaz,Iran
تعداد صفحه
6
كليدواژه
Flow assurance#Pipeline#Riser#Offshore Pipeline#OLGA software#
سال انتشار
1400
عنوان كنفرانس
هفدهمين كنگره ملي مهندسي شيمي ايران
زبان مدرك
انگليسي
چكيده فارسي
In this study, the flow assurance of production liquid rate is analyzed, using OLGA software for Pipeline-Riser of an offshore platform. By applying different methods such as installing a gas lift valve at the Pipe-Riser or set a choke valve at the top side of the Riser, on the pipeline connected to the separator at the platform. The model in OLGA is designed to be 7.5 km long, a 200 m Riser, and 70 m a pipe connected to the separator. Using PVTSIM software, calculate the fluid properties and export a PVTSIM-file of the fluid for OLGA software. The results have shown that using a gas lift valve at 7 or 14 kg/s mass flow rate got the best total liquid volume rate in comparison to other methods. The increment in total liquid rate by using this method is 1100 m3/day.
كشور
ايران
لينک به اين مدرک