• شماره ركورد كنفرانس
    5115
  • عنوان مقاله

    Flow Assurance in Pipeline-Riser System Using OLGA Software

  • پديدآورندگان

    Torfi Salehi Mohamad MohammadTorfiSa@yahoo.com Petroleum University of Technology,Ahwaz,Iran , Bahri Moghaddam Mehdi Bahri@aut.ac.ir Petroleum University of Technology,Ahwaz,Iran

  • تعداد صفحه
    6
  • كليدواژه
    Flow assurance#Pipeline#Riser#Offshore Pipeline#OLGA software#
  • سال انتشار
    1400
  • عنوان كنفرانس
    هفدهمين كنگره ملي مهندسي شيمي ايران
  • زبان مدرك
    انگليسي
  • چكيده فارسي
    In this study, the flow assurance of production liquid rate is analyzed, using OLGA software for Pipeline-Riser of an offshore platform. By applying different methods such as installing a gas lift valve at the Pipe-Riser or set a choke valve at the top side of the Riser, on the pipeline connected to the separator at the platform. The model in OLGA is designed to be 7.5 km long, a 200 m Riser, and 70 m a pipe connected to the separator. Using PVTSIM software, calculate the fluid properties and export a PVTSIM-file of the fluid for OLGA software. The results have shown that using a gas lift valve at 7 or 14 kg/s mass flow rate got the best total liquid volume rate in comparison to other methods. The increment in total liquid rate by using this method is 1100 m3/day.
  • كشور
    ايران