شماره ركورد كنفرانس :
453
عنوان مقاله :
Application of TOPSIS and Group AHP for Project Management
پديدآورندگان :
Golpîra H نويسنده , Moradi V نويسنده
كليدواژه :
S-Curves , HYPOTHESIS , Project Management , MCDM
عنوان كنفرانس :
چهارمين كنفرانس بين المللي انجمن ايران تحقيق در عمليات
چكيده فارسي :
Eliminating impacts of all variables that influence the projects turns out to be not possible.
Thus, managers must be able to manage variables and also their effects. Recent project control
methods cannot consider all of criteria which affect projects and are not desirable for all projects main
elements. This paper proposes a new comprehensive method to calculate a progress of projects. The
method uses any factors which affect the projects in order to increase accuracy and flexibility and also
ensures the integrity of projects. To achieve this purpose, activities of projects are weighted by GAHP
and TOPSIS methods. Efficiency of the proposed method has been verified on a stadium practical
project. The results are illustrated by S-curve and also proved by analyze of variance
شماره مدرك كنفرانس :
1891451