• Author/Authors

    METE, Süleyman Tunceli Üniversitesi - Mühendislik Fakültesi - Endüstri Mühendisliği Bölümü, Turkey , AĞPAK, Kürşad Gaziantep Üniversitesi - Mühendislik Fakültesi - Endüstri Mühendisliği Bölümü, Turkey

  • Title Of Article

    MULTI OBJECTIVE GENERALIZED RESOURCE CONSTRAINED TWO SIDED ASSEMBLY LINE BALANCING PROBLEM AND COMPUTATIONAL ANALAYSIS

  • شماره ركورد
    16679
  • Abstract
    Assembly of large size products like bus, truck and automobile can perform both sides of assembly line. In such cases, both sides (right and left) of the line are used to achieve for the assembly operation. These types of the lines are called as two sided assembly lines. When large size products are produced, sometimes they require a specific machine or a qualified staff to use this machine. This condition also exposes the problem of resource constraint. Therefore, in this study, a mathematical model for generalized resource constraint two sided assembly line balancing problem is presented, based on literature models and computational analysis is performed for multi-objective situation. Proposed model is run and analyzed over several known test problems by considering three objective functions (Minimization number of station, number of position and resource cost).
  • From Page
    567
  • NaturalLanguageKeyword
    Generalized resource constrained , two sided assembly line
  • JournalTitle
    Journal Of The Faculty Of Engineering an‎d Architecture Of Gazi University
  • To Page
    576
  • JournalTitle
    Journal Of The Faculty Of Engineering an‎d Architecture Of Gazi University