Author/Authors
çalişkanelli, süheyla pelin dokuz eylül üniversitesi - mühendislik fakültesi - inşaat mühendisliği bölümü, İzmir, Turkey , tanyel, serhan dokuz eylül üniversitesi - mühendislik fakültesi - inşaat mühendisliği bölümü, İzmir, Turkey
Title Of Article
Investigation of major stream delays at unsignalized intersections
شماره ركورد
41173
Abstract
The general acceptance of vehicle movements at unsignalized intersections is that vehicles in the major stream have absolute priority. However, under real traffic conditions this may not always be possible. Studies show that drivers waiting on the minor road approach can exhibit irregular behaviors when entering the intersection. In this case the drivers on the main road will try to prevent a possible accident by stopping or slowing down. This is referred to as reverse priority or gap forcing which causes delays in vehicles in the major stream. In the study, the conditions which causes delay to vehicles in the mainstream is investigated by using AIMSUN simulation program and new functions for stop-controlled, yield-controlled and uncontrolled intersections which can be used in calculation major stream delays are suggested.
From Page
1093
NaturalLanguageKeyword
Unsignalized intersections , Capacity , Delay , Reverse priortiy
JournalTitle
Pamukkale University Journal Of Engineering Sciences
To Page
1099
JournalTitle
Pamukkale University Journal Of Engineering Sciences
Link To Document