• Author/Authors

    ANBARCI, Murat İstanbul Üniversitesi - Mühendislik Fakültesi - İnşaat Mühendisliği Bölümü, İnşaat Yönetimi Bilim Dalı, Turkey , ÖZ, Burak Bülent Ecevit Üniversitesi - Mühendislik Fakültesi - İnşaat Mühendisliği Bölümü, İnşaat Yönetimi Bilim Dalı, Turkey

  • Title Of Article

    A Fuzzy Logic Evaluation Model To Select A Site Chief For Construction Projects

  • شماره ركورد
    43910
  • Abstract
    A construction company struggles to deliver the undertaken project within time, budget, and desired quality. Selection of technical personnel is generally made on the basis of a decision maker’s subjective evaluation, and includes fuzzy linguistic variables; therefore, the best suitable candidate cannot be seen easily. The aim of this study is to develop a fuzzy logic evaluation model to be able to select appropriate technical personnel. For this purpose, it is determined decision criteria, the evaluation fuzzy set and the affect fuzzy set in a construction project for selecting site chief. Thus, a construction project will be able to be completed in time, within desired quality and budget by using this model.
  • From Page
    104
  • NaturalLanguageKeyword
    Construction Management , Fuzzy Logic , Human Resources , Personnel Selection
  • JournalTitle
    International journal of advances in engineering and pure sciences
  • To Page
    113
  • JournalTitle
    International journal of advances in engineering and pure sciences