DocumentCode
1000665
Title
Synchronized, end-to-end tests on protective relay schemes
Author
Ryan, Bob ; Littman, Jeff
Author_Institution
Doble Eng. Co., USA
Volume
8
Issue
4
fYear
1995
fDate
10/1/1995 12:00:00 AM
Firstpage
20
Lastpage
25
Abstract
Public domain satellite timing signals are being used to synchronize simultaneous secondary injection tests on power system protective relay schemes at remote ends of power transmission lines. By this means, protection schemes that include communication functions can be tested in a meaningful, time-related manner. A discussion of the need for such a test method, the principles and history of the test method, and details of a recent series of tests are included
Keywords
power system measurement; power system protection; power system relaying; power transmission lines; relay protection; synchronisation; testing; transmission networks; communication functions; end-to-end tests; power systems; power transmission lines; protective relay schemes; satellite timing signals; secondary injection test synchronisation; test method; Impedance; Power transmission lines; Protection; Protective relaying; Relays; Signal design; Stability; System testing; Timing; Voltage;
fLanguage
English
Journal_Title
Computer Applications in Power, IEEE
Publisher
ieee
ISSN
0895-0156
Type
jour
DOI
10.1109/67.468293
Filename
468293
Link To Document