DocumentCode
1003429
Title
Power Limits of 220-Kv Transmission Lines
Author
Kroneberg, Alex A. ; Macferran, Mabel
Author_Institution
Southern Calif. Edison Co., Ltd., Los Angeles
Volume
53
Issue
12
fYear
1934
Firstpage
1794
Lastpage
1802
Abstract
For the transmission of power from Boulder Dam to the system of the Southern California Edison Company, numerous studies were made to determine the power limits of various designs of transmission lines, and the maximum generating capacity that could be installed safely at Boulder Dam without incurring instability. These studies were made for various design features and types of load and faults. The results of the studies are presented in this paper, a description of the method used being included in the appendixes.
Keywords
Adders; Circuit faults; Circuit stability; Power generation; Power generation economics; Power system economics; Power transmission lines; Shafts;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Transactions of the
Publisher
ieee
ISSN
0096-3860
Type
jour
DOI
10.1109/T-AIEE.1934.5056602
Filename
5056602
Link To Document