DocumentCode
1007316
Title
Statistical quality control applied to code inspections
Author
Christenson, Dennis A. ; Huang, Stell T. ; Lamperez, Alfred J.
Author_Institution
AT&T Bell Lab., Naperville, IL, USA
Volume
8
Issue
2
fYear
1990
fDate
2/1/1990 12:00:00 AM
Firstpage
196
Lastpage
200
Abstract
Code inspections have been used on the 5ESS switch project since 1983. Beginning with a training program for all the developers involved in the project, code inspections have improved with each new 5ESS switch generic. Variations on a standard SQC (statistical quality control) technique, the control chart, have been used to track the metrics indicative of the effectiveness of code inspections. Parameters used in the computation of these metrics include the preparation effort, inspection time, number of inspectors, the size of the inspected unit of code, and the number of errors found at the inspection. It is noted that the exact form that these control charts have taken has evolved and improved with experience
Keywords
codes; electronic switching systems; inspection; quality control; 5ESS switch; code inspections; control chart; errors; inspection time; preparation effort; statistical quality control; training program; Code standards; Control charts; Inspection; Manufacturing industries; Manufacturing processes; Quality control; Software quality; Steel; Switches; Technological innovation;
fLanguage
English
Journal_Title
Selected Areas in Communications, IEEE Journal on
Publisher
ieee
ISSN
0733-8716
Type
jour
DOI
10.1109/49.46872
Filename
46872
Link To Document