Title :
Ultrahigh-Speed Reclosing or High-Voltage Transmission Lines
Author :
Sporn, Philip ; Prince, D.C.
Author_Institution :
Vice-president and chief engineer of the American Gas & Electric Company, New York, N. Y.
Abstract :
Reclosure of circuit breakers following a fault on a high-voltage transmission line with a minimum of delay in order that synchronous load will not fall out of step is described in this paper. Apparatus that performs a complete operation in approximately 20 cycles on a 60-cycle system may be used to obtain a high degree of service continuity from a single-circuit transmission line.
Keywords :
Circuit breakers; Circuit faults; Delay effects; Distributed parameter circuits; Lightning; Protective relaying; Transmission lines; Voltage fluctuations;
Journal_Title :
American Institute of Electrical Engineers, Transactions of the
DOI :
10.1109/T-AIEE.1937.5057425