Title :
Trends in the Design and Arrangement of Electrical Equipment in Hydraulic Power Plants
Author_Institution :
Engineering division of the central station department of General Electric Company, Schenectady, N. Y.
Abstract :
From the foregoing discussion, it has been seen that the outstanding trends in the design and arrangement of electrical equipment in hydraulic power plants, with but a few exceptions, are toward greater simplification, reliability, and lower first cost. Inasmuch as fixed charges constitute the major portion of the cost of hydro power, a reduction in first cost affords the principal means for securing a reduction in the cost of water power.
Keywords :
Costs; Energy measurement; Instruments; Manufacturing processes; Power generation; Testing; Water resources;
Journal_Title :
American Institute of Electrical Engineers, Transactions of the
DOI :
10.1109/T-AIEE.1939.5057928