Title :
Increased Capacity an Interconnections of the Columbia Gas and Electric Corporation
Author_Institution :
Vice-President of the Columbia Engineering Corporation, Cincinnati, Ohio.
fDate :
6/1/1941 12:00:00 AM
Keywords :
Acceleration; Bandwidth; Brushes; Cities and towns; Commutation; Floods; Irrigation; Substations; Testing; Voltage;
Journal_Title :
American Institute of Electrical Engineers, Transactions of the
DOI :
10.1109/T-AIEE.1941.5058360