DocumentCode
1019831
Title
Low-, Medium-, and High-Pressure Gas-Filled Cable
Author
Shanklin, G.B.
Author_Institution
Engineer of the cable division, central station department, General Electric Company, Schenectady, N. Y.
Volume
61
Issue
10
fYear
1942
Firstpage
719
Lastpage
726
Abstract
After preliminary development work systematic laboratory tests, closely simulating service conditions, were started in 1934 leading towards final development and improvement of gas-filled cable. The first full-size field installation of gas-filled cable was placed in service in 1938. The results of this work up to that time were summarized in an AIEE paper presented at the winter convention, January 1939. The present paper will deal with progress made since then, covering the whole range of voltage ratings from 10 kv to 138 kv, divided as follows: low-pressure gas-filled cable systems 10 kv to 40 kv, operating at gas pressures from 10 to 15 pounds per square inch; medium-pressure systems 40 kv to 69 kv, operating at gas pressures from 24 to 40 pounds per square inch; high-pressure systems 69 kv to 138 kv, operating at gas pressures from 150 to 200 pounds per square inch.
Keywords
Building materials; Cable shielding; Conductors; Feeds; Insulation; Laboratories; Nitrogen; Pressure control; System testing; Voltage;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Transactions of the
Publisher
ieee
ISSN
0096-3860
Type
jour
DOI
10.1109/T-AIEE.1942.5058433
Filename
5058433
Link To Document