DocumentCode :
1022015
Title :
First steps to wide area control
Author :
Atanackovic, Djordje ; Clapauch, J.H. ; Dwernychuk, Greg ; Gurney, J. ; Lee, Hongseok
Author_Institution :
British Columbia Transm. Corp., Vancouver
Volume :
6
Issue :
1
fYear :
2008
Firstpage :
61
Lastpage :
68
Abstract :
The implementation of synchronized phasor measurements for system monitoring and control is receiving unparalleled attention in the power industry.In this article, we describe recent work to incorporate phasor measurements from several locations in the transmission system into a control center state estimator, the prime application for assisting the operators to understand the operating state of the power system and for making informed decisions with respect to scheduling transmission capacity and responding to contingencies.
Keywords :
decision making; phase measurement; power system measurement; power system planning; power system state estimation; power transmission control; contingency analysis; control center state estimator; decision making; power system control; power system monitoring; synchronized phasor measurement; transmission capacity scheduling; transmission system; wide area control; Control systems; Electrical equipment industry; Industrial control; Job shop scheduling; Monitoring; Power measurement; Power system control; Power system measurements; Power systems; State estimation;
fLanguage :
English
Journal_Title :
Power and Energy Magazine, IEEE
Publisher :
ieee
ISSN :
1540-7977
Type :
jour
DOI :
10.1109/MPAE.2008.4412941
Filename :
4412941
Link To Document :
بازگشت