• DocumentCode
    1022015
  • Title

    First steps to wide area control

  • Author

    Atanackovic, Djordje ; Clapauch, J.H. ; Dwernychuk, Greg ; Gurney, J. ; Lee, Hongseok

  • Author_Institution
    British Columbia Transm. Corp., Vancouver
  • Volume
    6
  • Issue
    1
  • fYear
    2008
  • Firstpage
    61
  • Lastpage
    68
  • Abstract
    The implementation of synchronized phasor measurements for system monitoring and control is receiving unparalleled attention in the power industry.In this article, we describe recent work to incorporate phasor measurements from several locations in the transmission system into a control center state estimator, the prime application for assisting the operators to understand the operating state of the power system and for making informed decisions with respect to scheduling transmission capacity and responding to contingencies.
  • Keywords
    decision making; phase measurement; power system measurement; power system planning; power system state estimation; power transmission control; contingency analysis; control center state estimator; decision making; power system control; power system monitoring; synchronized phasor measurement; transmission capacity scheduling; transmission system; wide area control; Control systems; Electrical equipment industry; Industrial control; Job shop scheduling; Monitoring; Power measurement; Power system control; Power system measurements; Power systems; State estimation;
  • fLanguage
    English
  • Journal_Title
    Power and Energy Magazine, IEEE
  • Publisher
    ieee
  • ISSN
    1540-7977
  • Type

    jour

  • DOI
    10.1109/MPAE.2008.4412941
  • Filename
    4412941