• DocumentCode
    1023426
  • Title

    Open systems procurement: a migration strategy

  • Author

    Sasson, A. Mayer

  • Author_Institution
    Consolidated Edison Co. of New York, NY, USA
  • Volume
    8
  • Issue
    2
  • fYear
    1993
  • fDate
    5/1/1993 12:00:00 AM
  • Firstpage
    515
  • Lastpage
    526
  • Abstract
    The current process for procuring energy management systems is inadequate for the procurement of open systems. Although one can point to cases of successful projects, present practices are largely responsible for electric utilities deploying systems which are not fully satisfactory and rapidly become technologically obsolete, and for vendors having serious problems in performing to contracts and surviving financially. These current practices are examined as a basis for identifying new open systems control center procurement strategies for the industry based on the concepts of migration and prototyping. The author stresses that only time will tell if the ideas presented together with those contributed by others adequately address the serious problems described
  • Keywords
    electricity supply industry; load management; open systems; power system computer control; energy management systems; load management; migration; open systems; power system computer control; procurement; prototyping; selection criteria; utilities; Contracts; Control systems; Electrical equipment industry; Energy management; Industrial control; Open systems; Power industry; Procurement; Prototypes; Stress;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.260832
  • Filename
    260832