DocumentCode :
1027666
Title :
Static Mho Distance and Pilot Relaying
Author :
Caleca, V. ; Horowitz, S.H. ; McConnell, A.J. ; Seeley, H.T.
Author_Institution :
American Electric Power Service Corporation
Volume :
82
Issue :
67
fYear :
1963
Firstpage :
424
Lastpage :
436
Abstract :
The functional requirements for high-speed transmission-line relaying are outlined, and a new principle for coordinating ultrahigh-speed tripping units in a pilot relay system is described. Application to 3-terminal lines is reviewed in principle and illustrated by an example. Factory and field tests and a lightning season´s field experience are recorded, showing tripping times of 6 to 16 msec (milliseconds) for the pilot relaying and 0.1 to 15 msec for the phase-backup relaying.
Keywords :
Circuit breakers; Costs; Investments; Lightning; Production facilities; Protective relaying; Relays; Springs; System testing; Transmission lines;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1963.291436
Filename :
4072818
Link To Document :
بازگشت