Title :
Switckgear and Control Features of Enlarged High-Power Testing Laboratory
Author :
Batten, W.B. ; Baumgartner, R.P. ; Champney, G.W. ; Fish, W.A. ; Walker, J.K.
Author_Institution :
Westinghouse Electric Corporation
Abstract :
Higher capacity testing facilities are being put into service at the Westinghouse Electric Corporation high-power testing laboratories at East Pittsburgh. This paper deals primarily with some of the switchgear and control features of the increased capacity facility.
Keywords :
Acceleration; Batteries; Buildings; Circuit breakers; Circuit testing; DC motors; Laboratories; Marine animals; Rectifiers; Switchgear;
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
DOI :
10.1109/TPAS.1963.291444