Title :
The Economies or Using Capacitors in Amounts to Require Automatic Switching
Author_Institution :
Capacitor section of the General Electric Company, Pittsfield, Mass.
Keywords :
Availability; Capacitors; Costs; Equations; Heating; Meeting planning; Power generation economics; Reactive power; Thermal factors; Thermal loading;
Journal_Title :
American Institute of Electrical Engineers, Transactions of the
DOI :
10.1109/T-AIEE.1947.5059448