DocumentCode :
1029797
Title :
Optimal Solution to the Hydro-Steam Dispatch Problem for Certain Practical Systems
Author :
Dahlin, E.B. ; Shen, D.W.C.
Author_Institution :
IBM Corporation, Control Systems Development Center
Issue :
5
fYear :
1966
fDate :
5/1/1966 12:00:00 AM
Firstpage :
437
Lastpage :
458
Abstract :
The maximum principle by Pontryagin is applied to the problem of determining the operation of a hydro-steam generating system for the minimum generating costs. The general dispatch formulas are derived for power systems with hydroelectric plants having fixed head, varying head, and hydraulic coupling, both with and without river transport delay and wave phenomena. Techniques are demonstrated which greatly simplify the computer solutions for fixed and varying head operation.
Keywords :
Calculus; Control systems; Costs; Hydroelectric power generation; Lagrangian functions; Power generation economics; Power systems; Propagation delay; Rivers; Water storage;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1966.291681
Filename :
4073060
Link To Document :
بازگشت