Title :
Change of Frequency on the System of the Southern California Edison Company
Author :
Tice, H.W. ; Kroneberg, A.A. ; Johnson, W.N. ; Enefer, J.D. ; Tugby, E.E. ; Sidway, C.L.
Author_Institution :
Vice president is charge of operation, Southern California Edison Company, Los Angeles, Cal.
Keywords :
Cities and towns; Costs; Electrical equipment industry; Frequency; History; Hydroelectric power generation; Job shop scheduling; Power generation; Power generation economics; Water;
Journal_Title :
American Institute of Electrical Engineers, Transactions of the
DOI :
10.1109/T-AIEE.1948.5059752