DocumentCode
1033105
Title
Dielectric Tests for EHV Transformers
Author
Kaufman, Richard B. ; Meador, Jack R.
Author_Institution
General Electric Company
Issue
1
fYear
1968
Firstpage
135
Lastpage
145
Abstract
Specific proposals for revision of dielectric tests for EHV power transformers are made. An objective is improved operating reliability by specifying tests which are more compatible with service requirements. Impulse and switching surge tests are coordinated independently with lightning arrester characteristics. Low-frequency tests are disassociated from transient voltage requirements and are related to operating voltage only. Low-frequency test voltages are reduced and their duration is increased; absence of corona during the test is required. Suggestions for further development work are made.
Keywords
Arresters; Corona; Dielectrics; Impulse testing; Insulation testing; Lightning; Power system transients; Power transformer insulation; Surge protection; System testing;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1968.292264
Filename
4073426
Link To Document