DocumentCode
1034369
Title
Application of Underfrequency Relays for Automatic Load Shedding
Author
Lokay, H.E. ; Burtnyk, V.
Author_Institution
Westinghouse Electric Corporation
Issue
3
fYear
1968
fDate
3/1/1968 12:00:00 AM
Firstpage
776
Lastpage
783
Abstract
During severe emergencies which result in insufficient generation to meet load, an automatic load shedding program throughout the affected area can prevent total area collapse. It also helps to achieve fast restoration of all affected loads. This paper describes the factors involved in applying underfrequency relays to achieve a desired "deficient generation" protection level and a calculating method to achieve optimum relay settings.
Keywords
Control systems; Frequency; Interconnected systems; Power generation; Power system relaying; Printing; Protective relaying; Relays; Spinning; Substation protection;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1968.292193
Filename
4073563
Link To Document