Synchronous Starting of Seneca Pumped Storage Plant
Author
Fitzgerald, John P. ; Groscup, Garrett W. ; Cooper, Edgar A. ; Byerly, Richart T. ; Whitney, Eugene C.
Author_Institution
The Cleveland Electric Illuminating Company
Issue
4
fYear
1969
fDate
4/1/1969 12:00:00 AM
Firstpage
307
Lastpage
315
Abstract
The synchronous starting method will be used at the Seneca Pumped Storage Plant when the two 220-MVA machines are started as motors. A 29-MVA generator will supply the driving power. Because the relative difference in machine size is greater than has been encountered in any existing plant, an extensive study was conducted to determine that reliable starting performance can be attained. Model tests and digital simulation have been used to investigate dynamic starting performance for a variety of conditions. A novel formulation of equations describing dynamic relationships of the two-machine system lends itself to efficient digital computation. Controls have been designed to permit reliable automatic remote control.
Keywords
Automatic control; Digital simulation; Equations; Power generation; Power supplies; Power system modeling; Power system reliability; Pumps; Synchronous motors; Testing;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1969.292451
Filename
4073837
Link To Document