DocumentCode
1037962
Title
Electrical Resynchronizing of a Large Cross-Compound Turbine-Generator Set: Part I - Analytical Study
Author
Lay, Rodney K. ; Lenfest, E. Harry ; Temoshok, Michael ; Winchester, Robert L.
Author_Institution
General Electric Company
Issue
7
fYear
1969
fDate
7/1/1969 12:00:00 AM
Firstpage
1137
Lastpage
1146
Abstract
The procedure for returning a cross-compound set to the line following load rejection and loss of excitation is complicated by the diverging "coast-down" characteristics of the two turbine-generators. The first phase of a resynchronizing procedure is to bring the speeds of the two generators to the same per-unit value. This paper presents the analytical study of the resynchronizing process, specifically as it was applied to Commonwealth Edison Company\´s Will County no. 4 set. The two-pole 332-MVA and four-pole 308-MVA units were successfully resynchronized from a range of speed differentials up to 0.4 pu by applying rated open-circuit field excitation to one unit.
Keywords
Circuit breakers; Eddy current testing; Eddy currents; Frequency synchronization; Instruments; Machinery; Monitoring; Turbines; Voltage; Winches;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1969.292514
Filename
4073952
Link To Document