• DocumentCode
    1037971
  • Title

    Electrical Resynchronizing of a Large Cross-Compound Turbine-Generator Set: Part II - Field Tests

  • Author

    Levine, David L. ; Lay, Rodney K. ; Temoshok, Michael

  • Author_Institution
    Commonwealth Edison Company
  • Issue
    7
  • fYear
    1969
  • fDate
    7/1/1969 12:00:00 AM
  • Firstpage
    1146
  • Lastpage
    1150
  • Abstract
    The procedure for retuming a cross-compound set to the line following load rejection and loss of excitation is complicated by the diverging "coast-down" characteristics of the two turbine-generators. The first phase of a resynchronizing procedure is to bring the speeds of the two generators to the same per-unit value. Test results of the resynchronizing process, specifically as it was applied to Commonwealth Edison Company\´s Will County no. 4 are presented here. The two-pole 332-MVA and four-pole 308-MVA units were successsfully resynchronized from a range of speed differentials up to 0.4 pu by applying rated open-circuit field excitation to one unit.
  • Keywords
    Acceleration; Manufacturing; Power generation; Printing; Shafts; Stator windings; Testing; Turbines; Turning; Voltage;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1969.292515
  • Filename
    4073953