DocumentCode
1037971
Title
Electrical Resynchronizing of a Large Cross-Compound Turbine-Generator Set: Part II - Field Tests
Author
Levine, David L. ; Lay, Rodney K. ; Temoshok, Michael
Author_Institution
Commonwealth Edison Company
Issue
7
fYear
1969
fDate
7/1/1969 12:00:00 AM
Firstpage
1146
Lastpage
1150
Abstract
The procedure for retuming a cross-compound set to the line following load rejection and loss of excitation is complicated by the diverging "coast-down" characteristics of the two turbine-generators. The first phase of a resynchronizing procedure is to bring the speeds of the two generators to the same per-unit value. Test results of the resynchronizing process, specifically as it was applied to Commonwealth Edison Company\´s Will County no. 4 are presented here. The two-pole 332-MVA and four-pole 308-MVA units were successsfully resynchronized from a range of speed differentials up to 0.4 pu by applying rated open-circuit field excitation to one unit.
Keywords
Acceleration; Manufacturing; Power generation; Printing; Shafts; Stator windings; Testing; Turbines; Turning; Voltage;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1969.292515
Filename
4073953
Link To Document