Abstract :
The procedure for retuming a cross-compound set to the line following load rejection and loss of excitation is complicated by the diverging "coast-down" characteristics of the two turbine-generators. The first phase of a resynchronizing procedure is to bring the speeds of the two generators to the same per-unit value. Test results of the resynchronizing process, specifically as it was applied to Commonwealth Edison Company\´s Will County no. 4 are presented here. The two-pole 332-MVA and four-pole 308-MVA units were successsfully resynchronized from a range of speed differentials up to 0.4 pu by applying rated open-circuit field excitation to one unit.
Keywords :
Acceleration; Manufacturing; Power generation; Printing; Shafts; Stator windings; Testing; Turbines; Turning; Voltage;
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
DOI :
10.1109/TPAS.1969.292515