DocumentCode
1040785
Title
Transient Overvoltages Caused by the Initiation and Clearance of Faults on a 1100-kV System
Author
Colclaser, R. Gerald, Jr. ; Wagner, Charles L. ; Buettner, Donald E.
Author_Institution
Westinghouse Electric Corporation
Issue
8
fYear
1970
Firstpage
1744
Lastpage
1751
Abstract
Overvoltages on UHV systems may be controlled to a level of 1.5 pu or less. Historically, lightning, line energizing, and line reenergizing overvoltages have been the primary factors in establishing power system design levels. At the new reduced levels, other transients must be considered. Fault initiation and fault clearing transients are investigated using different system configurations. Minimum levels are established by fault initiation transients. Fault clearing overvoltages can be controlled to corresponding levels by the insertion of opening resistors.
Keywords
Circuit breakers; Circuit faults; Costs; Insulation; Lightning; Power system transients; Resistors; Surges; Switching circuits; Voltage control;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1970.292758
Filename
4074258
Link To Document