Title :
Relaying the B. C. Hydro 500-KV System
Author :
Engelhardt, K.H. ; Hayden, S.R. ; Crockett, J. ; Duggan, W.P.
Author_Institution :
B. C. Hydro & Power Authority
fDate :
5/1/1971 12:00:00 AM
Abstract :
A unique relay system developed for B. C. Hydro´s Peace River Project is described herein. The line protection consists of a semi-static dual primary, direct under-reaching transfer trip and permissive over-reaching schemes with microwave and power line channels connected redundantly. The relaying system was thoroughly tested on a model transmission line so that adequate consideration could be given to the effect of load current, swings, and transients related to series capacitors, line shunt capacitance and switching.
Keywords :
Capacitors; Power system modeling; Power system protection; Power system relaying; Power system transients; Power transmission lines; Protective relaying; Relays; Rivers; System testing;
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
DOI :
10.1109/TPAS.1971.292884