DocumentCode :
1043678
Title :
Control system replacement at the Reid Gardner Station
Author :
Davis, Jon F. ; Julian, Gary A.
Author_Institution :
Nevada Power Co., Las Vegas, NV, USA
Volume :
3
Issue :
2
fYear :
1988
fDate :
6/1/1988 12:00:00 AM
Firstpage :
225
Lastpage :
229
Abstract :
The scope and schedule of the first phase of a two-unit control system replacement at the Reid Gardner Station are described. This project was undertaken so that the tie-in of control system equipment coincided with major boiler rework and without additional outage time for the control system replacement work. The units in this project were typical in size and equipment type
Keywords :
control systems; power station computer control; power stations; Reid Gardner Station; boiler rework; two-unit control system replacement; Automatic control; Boilers; Control systems; Furnaces; Hardware; Logic; Petroleum; Power generation; Pressure control; Temperature control;
fLanguage :
English
Journal_Title :
Energy Conversion, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8969
Type :
jour
DOI :
10.1109/60.4722
Filename :
4722
Link To Document :
بازگشت