• DocumentCode
    1044418
  • Title

    Fast Valving as an Aid to Power System Transient Stability and Prompt Resynchronization and Rapid Reload After Full Load Rejection

  • Author

    Cushing, E.W., Jr. ; Drechsler, G.E. ; Kilgoar, W.P. ; Marshall, H.G. ; Stewart, H.R.

  • Author_Institution
    Montaup Electric Co.
  • Issue
    6
  • fYear
    1971
  • Firstpage
    2517
  • Lastpage
    2527
  • Abstract
    As steam turbine generator units increase in rating, their inertia constants tend to decrease and their reactance constants to increase, thus aggravating the power system transient stability problem. There is also a tendency for the complete unit to take longer to restart and reload when unscheduled disconnection from the system takes place. Counter measures are needed and may be available within the power plant. A study of these measures was made by the authors acting as a Working Group of NewEngland´s NEPLAN Planning Committee´s System Design Task Force. The paper presents the Working Group´s findings as widely supported by the major utilities in New England.
  • Keywords
    Circuit faults; Power generation; Power system interconnection; Power system reliability; Power system stability; Power system transients; Power transmission lines; Resistors; Turbines; Voltage;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1971.292864
  • Filename
    4074629