DocumentCode :
1045144
Title :
Project UHV.-Construction and Technical Plan
Author :
Anderson, John G. ; Doyle, Joseph R. ; O´Brien, E.J.
Author_Institution :
General Electric Company
Issue :
1
fYear :
1972
Firstpage :
204
Lastpage :
211
Abstract :
A description is given of the facilities at Project UHV for the study of EHV and UHV ac transmission problems up to 1500 kV. These facilities include a 1500/¿3 kV, single-phase autotransformer, a special 900-kV lightning arrester, and much associated UHV and EHV measuring equipment. Special stringing procedures are employed to string overhead test lines, and special test cages yield the corona characteristics of bundle conductors. Research is in progress on 1000 to 1500 kV transmission lines.
Keywords :
Arresters; Conductors; Contamination; Corona; Flashover; Insulation; Lightning; Testing; Transmission line measurements; Voltage;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1972.293332
Filename :
4074701
Link To Document :
بازگشت