DocumentCode :
1046832
Title :
Development and Installation of 138 kV Cable System for Tests at EEI Waltz Mill Station: Cable 21
Author :
Bahder, George ; McKean, A.L. ; Carroll, Johrn C.
Author_Institution :
Phelps Dodge Cable & Wire Company
Issue :
4
fYear :
1972
fDate :
7/1/1972 12:00:00 AM
Firstpage :
1427
Lastpage :
1433
Abstract :
This paper describes the initial phase of an Industry development program, comprising one manufacturer´s Laboratory development work to provide a 138 kV crosslinked polyethylene cable system, carried out in accordance with an acceptance test program recommended by the Electric Research Council representing the electric utilities in the U. S.
Keywords :
Cables; Corona; Dielectrics and electrical insulation; Laboratories; Manufacturing; Milling machines; Polyethylene; Prototypes; System testing; Voltage;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1972.293275
Filename :
4074871
Link To Document :
بازگشت