DocumentCode
1046832
Title
Development and Installation of 138 kV Cable System for Tests at EEI Waltz Mill Station: Cable 21
Author
Bahder, George ; McKean, A.L. ; Carroll, Johrn C.
Author_Institution
Phelps Dodge Cable & Wire Company
Issue
4
fYear
1972
fDate
7/1/1972 12:00:00 AM
Firstpage
1427
Lastpage
1433
Abstract
This paper describes the initial phase of an Industry development program, comprising one manufacturer´s Laboratory development work to provide a 138 kV crosslinked polyethylene cable system, carried out in accordance with an acceptance test program recommended by the Electric Research Council representing the electric utilities in the U. S.
Keywords
Cables; Corona; Dielectrics and electrical insulation; Laboratories; Manufacturing; Milling machines; Polyethylene; Prototypes; System testing; Voltage;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1972.293275
Filename
4074871
Link To Document