  • Title

    Future Transmission - Underground?

  • Author

    Corry, Andrew F. ; Kasum, E.

  • Author_Institution
    Boston Edison Company
  • Issue
    2
  • fYear
    1973
  • fDate
    3/1/1973 12:00:00 AM
  • Firstpage
    520
  • Lastpage
    523
  • Abstract
    Future transmission systems will handle larger blocks of power and a greater percentage will be installed underground. Solutions to the present limitations on operating such systems are being developed and it is anticipated that the economies of size will reduce the competitive disadvantage. It is important that continued effort be directed in this field so that the necessary systems are developed.
  • Keywords
    Construction industry; Costs; Extrapolation; Flexible printed circuits; Helium; Power demand; Power generation; Power industry; Power transmission lines; Water pollution;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1973.293752
  • Filename
    4075106