Design and Installation of a 138-KV, High-Pressure, Gas-Filled Pipe Cable Utilizing Segmental Aluminium Conductors
Author :
Roughley, T.H. ; Corbett, J.T. ; Winkler, G.L. ; Eager, G.S. ; Turner, S.E.
Author_Institution :
The Detroit Edison Company
Issue :
2
fYear :
1974
fDate :
3/1/1974 12:00:00 AM
Firstpage :
658
Lastpage :
668
Abstract :
This paper presehits the results of further developments of 138-kV cable impregnated with extra-high-viscosity oil, as well as those of joining aluminum conductors and terminal ferrules by the inert gas shielded arc welding method. Welding the conductors in the presence of heavy oil had presented the chief deterrent to commercial utilization of cable containing alumliinum conductors. Success of these investigations has resulted in installation of a 2.74 mile (4.41 km) portion of The Detroit Edison Company Medina-Stephens 120-kV line, commissioned in November 1971. That installation is reported upon herein.
Keywords :
Aluminum; Cable shielding; Circuits; Conductors; Copper; Petroleum; Power cables; Power generation economics; Senior members; Welding;
fLanguage :
English
Journal_Title :
Power Apparatus and Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9510
Type :
jour
DOI :
10.1109/TPAS.1974.294028
Filename :
4075402
Link To Document :
بازگشت