An Interactive Procedure for Sizing and Timing Distribution Substations Using Optimization Techniques
Author
Masud, Enver
Author_Institution
Oklahoma Gas and Electric Company
Issue
5
fYear
1974
Firstpage
1281
Lastpage
1286
Abstract
This paper defines a mathematical model which simulates the growth of a power system and determines the least cost expansion plan for a system of distribution substations. A new approach employing linear and integer programming is used to optimize the system´s substation capacities subject to the constraints of cost, load, voltage, and reserve requirements. The model has been successfully applied to a 1600 square mile urban area served by 70 distribution substations.
Keywords
Constraint optimization; Cost function; Linear programming; Mathematical model; Power system modeling; Power system simulation; Substations; Timing; Urban areas; Voltage;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/TPAS.1974.293851
Filename
4075490
Link To Document