    An Interactive Procedure for Sizing and Timing Distribution Substations Using Optimization Techniques

  • Author

    Masud, Enver

  • Author_Institution
    Oklahoma Gas and Electric Company
  • Issue
    5
  • fYear
    1974
  • Firstpage
    1281
  • Lastpage
    1286
  • Abstract
    This paper defines a mathematical model which simulates the growth of a power system and determines the least cost expansion plan for a system of distribution substations. A new approach employing linear and integer programming is used to optimize the system´s substation capacities subject to the constraints of cost, load, voltage, and reserve requirements. The model has been successfully applied to a 1600 square mile urban area served by 70 distribution substations.
  • Keywords
    Constraint optimization; Cost function; Linear programming; Mathematical model; Power system modeling; Power system simulation; Substations; Timing; Urban areas; Voltage;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1974.293851
  • Filename
    4075490